Thursday, January 12, 2012

Kurrajong…..

 

First a bit of history, taken from Wikipedia.

The Kurrajong railway line was a railway line in the distant rural western suburbs of Sydney, New South Wales, Australia. It was an extension of the branch off the Main Western line from Blacktown to Richmond and was operated by the New South Wales Government Railways.

The construction of the railway between Richmond and Kurrajong did not receive Parliamentary authorisation until 1919, by which time roads were being improved to a standard that did not warrant a railway to bring the produce of the area west of the Hawkesbury River to the Sydney market. From its opening in 1926 until its closure in 1952, it remained a minor branch line.

The branch began in the back platform at Richmond and continued across East Market Street on a level crossing which was protected by a station employee with a red flag or red light. It then passed around Richmond Oval, continuing in a north west direction along March Street at the far end of which it left the town centre and entered its own right of way. This dropped through a cutting towards the river on a 1 in 50 grade before making its way across the alluvial soil of the level floodplain. Trains were running to this point by April, 1925.

Gravel trains ran from the Nepean Sand and Gravel Siding located just before the line crossed the Old Kurrajong Road. This material was being used in the construction of Sydney Harbour Bridge.

A very short passenger platform was located on the eastern bank of the river. This opened in 1928 with the misnomer of Nepean Bridge. It was renamed Phillip in 1934. This location was a favourite swimming and picnic spot.

The bridge over the Hawkesbury River for the railway was erected on concrete piers which were an extension of those supporting the adjacent road bridge. Upon leaving the river, the line ascended on a 1 in 36 grade through the western river bank and reached Bells Line of Road which it crossed at a 45° angle and entered North Richmond station. This station had a 200 feet (61 m) long platform with shelter, a goods siding.

Upon leaving the station, the railway continued in a straight alignment, largely through the property of farmers. Being classed as a 'pioneer line', the route was unfenced, the rails second-hand and laid on wooden sleepers with ash ballast. Stopping locations were established between North Richmond and Kurrajong at locations which, in 1928, were named Red Cutting, Kemsleys, Thompsons Ridge, Nurri and Duffys. The line through these locations passed orchards and small farms as it slowly climbed into what is the foothills of the Blue Mountains. Embankments and cuttings were now a feature of the line as it headed towards its terminus. Kurrajong station was located on a site carved from the side of the ridge on which the village is situated. A concrete slab station building stood on the platform. There was a run-round loop and looped goods siding which served a goods shed and hand crane.

The speed limit for passenger and mixed was just 20 mph (32 km/h) and safeworking was by means of Ordinary Train Staff.

Very little freight was handled on the line beyond Hawkesbury River. It was far more convenient for orchardists to use road freight to the Sydney markets as this gave the opportunity for back loading of fertiliser and other farm requisites.

Whilst the line was initially considered a country branch line, from 10 October 1941 it was brought into the Sydney Metropolitan fare scales. This permitted reduced off-peak returns and child weekend excursions.

The closing date was not one with the usual advanced notice. Heavy rain on the weekend of 12 and 13 June 1952, caused the Hawkesbury River to flood and, as was usual with such occurrences, the railway service was suspended. More flooding followed in the following weeks and a bus had been substituted on the Kurrajong side of the river with a floodboat ferrying passengers across the flooded stream. A cutting near the terminus had collapsed and, despite constant efforts, would not stabilise until prolonged dry weather returned.

Consequently, it was announced that in view of the damage to the line and the fact that the line was never a commercial success, the line would not reopen. The usual round of Protest Meetings occurred, but finally, on 17 September 1952, the newly appointed Commissioner for Railways, Reg Winsor, made the official notification. The total annual income of the line was less than the cost of repairs.

In the next post lets take this history and turn it into a model proposal.

Cheers for now,

Andrew

No comments:

Post a Comment